Good ponding test waterproofing photos show four things: the prepared surface, the finished membrane, the water standing at the specified level with a fixed marker, and the dry underside at the end. Each photo needs a trusted date, time and place. This post is for site engineers, waterproofing applicators and builders who must show, before handover, that the terrace was tested and passed. It gives a photo routine, the notes to write, and what a photo cannot prove.
The leak nobody could trace to a date
A builder hands over a flat in March. In the monsoon, a damp patch appears on the ceiling of the flat below. The owner says the terrace was never tested. The applicator says it was, a few weeks before tiling.
The only evidence is two phone photos of a flooded terrace in a WhatsApp group. Neither has a visible date. Nobody can say if the water was at the right level, if the outlets were blocked, or if the underside was checked. The argument runs for months, and the builder repairs the terrace to settle it.
A short, dated photo record taken during the test would have answered the question in minutes.
Why a missing ponding test record costs money
A ponding test is done once, usually before the screed or tiles go on. After that the membrane is covered. If the test cannot be shown later, the only way to find a fault is to break the finish.
The cost shows up in four places:
- Breaking and relaying: tiles and screed are removed to inspect or redo the membrane.
- Disputed running bills: a client or PMC (project management consultant) may hold a bill for the waterproofing item until the test is shown.
- Handover delay: the snagging list stays open on the terrace line.
- Blame that cannot be sorted: the applicator, the main contractor and the builder each point at someone else.
The same logic applies to any work that gets covered. Our post on proof of concealed work photos covers the general routine.
With proof and without
| Without a record | With a dated photo record | |
|---|---|---|
| Test happened? | Your word against theirs | Time-stamped photos and video from the site |
| Water level | Unknown | Marker and water line visible |
| Outlets blocked? | Unknown | Visible in the photo |
| Result | "It passed" | Dry underside, photographed at the end |
| Leak after handover | Break and inspect | Check the record first, then decide |
The record does not end a dispute by itself. It gives everyone the same facts to start from.
The photo standard: surface, membrane, water level, result
First, find the rule for your job. Your project specification and the membrane maker's technical data sheet set the water depth, the duration, the curing time before the test and the pass condition. The BIS code of practice, IS 3067:1988, covers general design details and preparatory work for waterproofing of buildings. Specifications often differ on depth and duration, so use the figures in your own contract and note them in the record. The same applies to the curing period, so check the data sheet before you fill the terrace.
Surface, before the membrane
Frame the whole terrace from a corner, then close-ups of the junctions, the skirting upturn, pipe penetrations and outlets. Show that the surface is clean, sound and sloped to the outlets. Take one photo of any crack or repair.
Membrane, after application and curing
Photograph the finished membrane over the full area, then the corners, the upturn height at the parapet and the sealing around each pipe and outlet. Include the product bag or label in one photo, so the product used is on record.
Water level, at the start
Block the outlets as the specification says, and photograph them blocked. Fix a ruler or a marked stick in the water. Take a wide photo of the terrace and a close photo of the marker with the water line against it. Add a short live video with audio, walking the edge, while someone says the time and the level aloud.
Water level, during and at the end
Return at intervals and repeat the same marker photo from the same spot. Do the last one at the end of the specified duration. A falling level is worth a note, since evaporation or a leak could be the cause.
Result, on the underside
Go to the ceiling or slab soffit below. Photograph every room under the terrace, including corners and beams. Show dry surfaces, or any damp patch with a hand or tape for scale. Then photograph the drained terrace.
What to say or write on site
Give the foreman one line: "Before we fill, I want the outlets blocked, a marker in the water, and a photo of each from the same spot."
A note beside each photo saves questions later. Keep it plain:
- Start note: "Terrace B, Block 2. Membrane cured since [date]. Outlets blocked. Water at [depth] on marker. Test starts [time]."
- End note: "Same marker. Water at [depth]. Duration [hours] as per specification. Underside of Flats 701 and 702 checked, dry."
- Failure note: "Damp patch at the pipe in the bathroom ceiling, Flat 702. Water drained. Repair to follow, test to be repeated."
Write a failed test down too. A repeated test with its own record shows the problem was found and fixed.
How to do it with Verafii
Verafii is a camera and report app. Photos and video come only from its own camera, with GPS and time stamped on at the shutter. The steps below follow that flow.
- Open Verafii at the terrace and start a job record for the site, so every photo, video and note is numbered in one session.
- Take the surface photos with the in-app camera, then the membrane photos.
- Block the outlets, fill the water, and take the wide and marker photos. Record a short live video with audio.
- Add a note to each stage with the depth, the time and the duration from your specification.
- Repeat the marker photo at the end, then capture the underside, room by room.
- Before you leave the site, make the one-tap PDF report. It carries your company's logo, location, device, time and a QR code.
- Send the report to the client or PMC.
Anyone with the report can scan the QR and reach a public page that lets them check it, with no account and no app.
The app works offline and uploads when the phone has signal, which helps on a terrace with a weak network.
Field, office, client
Field
The applicator or site engineer captures live, follows the four stages, and writes the notes while the test is running. Phone photos from the gallery or a chat forward are not the same record, since the time and location may have been lost.
Office
The site office or the quality engineer reviews the job record against the specification: are all four stages there, is the marker visible, is the duration covered, is every room below photographed? If a stage is missing, ask the field team the same day, while the water is still on the terrace.
Client
The client or PMC receives the PDF report and can scan the QR to check a Verafii report. Whether they accept it for a bill or a handover is their decision. Link the record from your construction site photo report and keep a copy with the final work completion report.
What photos can't show
Be clear with the client about the limits of this record.
- Membrane quality: a photo cannot show the material grade, its thickness or whether the product matches the data sheet.
- Future seepage: a passed test shows the terrace held water for that period. It does not show that nothing will seep later.
- Hidden faults: a pinhole under a covered layer, or a weak lap, may not show on camera.
- Exact water depth: a marker helps, but a photo from an angle can mislead. Measure and write it down.
- Location accuracy: GPS can drift indoors and near tall buildings, so a point a few metres off is not proof of a false record. Ask before you accuse.
- Fake location: Verafii flags a photo taken with a fake location on Android and iPhone. That is a flag for a reviewer, not a guarantee.
Warranty and liability are matters for the parties to the contract. This record is evidence for them to weigh, not a verdict.
The checklist
- Specification read: test depth, duration, curing time and pass rule taken from the project specification and the maker's data sheet.
- Surface photos: whole terrace, junctions, upturns, pipes and outlets.
- Membrane photos: full area, corners, upturn height and the product label.
- Outlets blocked: photographed as blocked.
- Marker fixed: ruler or marked stick in the water.
- Start photos: wide and marker close-up, with a start note.
- Interval photos: from the same spot, at the same marker.
- End photos: marker at the end of the duration, with an end note.
- Underside photos: every room and corner below the terrace.
- Report made: PDF created before leaving the site, and the QR checked.
Frequently asked questions
How long should a terrace ponding test run?
The duration and water depth come from your project specification and the membrane maker's technical data sheet, so read those first. The BIS code IS 3067:1988 covers general design and preparatory work, not your contract. Write the figures you used in the test note.
What photos should I take for a ponding test?
Take the prepared surface, the finished membrane, the water level against a fixed marker at the start and end, and the dry underside below. Add the blocked outlets and a short live video. Each photo should carry a trusted date, time and place.
Can a photo prove the waterproofing will not leak later?
No. A photo shows the test was done and what it looked like at that time. It cannot show membrane quality, thickness or future seepage.
Why is a phone photo from WhatsApp weak proof of a ponding test?
Chat apps often drop location and the visible date, and a gallery photo may be old. The reviewer sees only the picture. A live capture with the time and location stamped in at the shutter is easier to trust.
How can a client check a ponding test report?
With a Verafii report, the client scans the QR code, which opens a public verification page. No account or app is needed. What they accept is their own decision.
Will Verafii make sure my ponding test record is accepted?
No. Whether a client, PMC or department accepts it is their decision. Verafii gives you time-stamped, located photos, notes and a PDF report to show what was done.
Should I record a failed ponding test too?
Yes. Photograph the damp patch, note the room and time, then record the repair and the repeat test. It shows the fault was found and dealt with.
Try it on your next terrace test
Start the 30-day free trial and capture one ponding test from surface to underside. If you have a larger team, ask for a quote. The price depends on your field agents, admin users, how long you keep evidence, and photo and video quality.